Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0671 #05 Y:2011 Reduce the pressure of compressed air to the minimum required $740 $200
MA0671 #04 Y:2011 Install occupancy sensors $1,328 $2,220
MA0671 #03 Y:2011 Shut off cooling if cold outside air will cool process $1,556 $15,000
MA0671 #02 Y:2011 Install / repair insulation on steam lines $4,780 $3,550
MA0671 #01 Y:2011 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $36,635 $200,000
MA0580 #09 Y:2005 Turn off equipment during breaks, reduce operating time $312 -
MA0580 #08 Y:2005 Re-size charging openings or add movable cover or door $444 -
MA0580 #07 Y:2005 Turn off equipment during breaks, reduce operating time $611 -
MA0580 #06 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,479 $825
MA0580 #05 Y:2005 Turn off equipment during breaks, reduce operating time $1,905 -
MA0580 #04 Y:2005 Reduce space conditioning during non-working hours $5,798 $1,375
MA0580 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $7,371 $34,720
MA0580 #02 Y:2005 Use minimum safe oven ventilation $8,663 $10,750
MA0580 #01 Y:2005 Improve air circulation with destratification fans / other methods $9,175 $6,831
MA0569 #04 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $825 $5,248
MA0569 #03 Y:2004 Insulate bare equipment $1,082 $494
MA0569 #02 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $1,234 $7,312
MA0569 #01 Y:2004 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $67,271 $331,800