Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Loudromat
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 45,000
ft2
Annual Production 1,040
ton
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,537 850,530
kWh
Electricity Demand $55,193 3,116
kW-mo/yr
Electricity Fees $1,721 -
Natural Gas $54,230 4,269
MMBtu
Fuel Oil #6 $131,725 22,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,141

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $67,271 $331,800 $50,734
660,600
kWh
$62,760
-
kW-mo/yr
$(-66,943.0)
-
MMBtu
$20,720
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,234 $7,312 $1,234
15,700
kWh
- - -
03 2.2511: Insulate bare equipment $1,082 $494 - - - $1,082
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $825 $5,248 $825
10,500
kWh
- - -
TOTAL RECOMMENDED $70,412 $344,854 $52,793
686,800
kWh
$62,760
-
kW-mo/yr
$(-66,943.0)
-
MMBtu
$21,802
-
MMBtu
TOTAL IMPLEMENTED $3,141 $13,054 $2,059
26,200
kWh
- - $1,082
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs