Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing and fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0052 #05 Y:2010 Utilize controls to operate equipment only when needed $12,940 $1,500
DL0052 #04 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $15,250 $9,000
DL0052 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $25,100 $24,000
DL0052 #02 Y:2010 Recycle air for heating, ventilation and air conditioning $53,946 $10,848
DL0052 #01 Y:2010 Avoid introducing hot, humid, or dirty air into hvac system $143,000 $81,500
MA0653 #06 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $2,375 $6,125
MA0653 #05 Y:2009 Insulate bare equipment $2,840 $7,510
MA0653 #04 Y:2009 Close off unneeded steam lines $3,551 $500
MA0653 #03 Y:2009 Reduce ventilation air $16,188 $752
MA0653 #02 Y:2009 Install smaller boiler (increase high fire duty cycle) $37,210 $68,000
MA0653 #01 Y:2009 Install smaller boiler (increase high fire duty cycle) $110,550 $270,000
LE0291 #11 Y:2009 Install occupancy sensors $3,572 $1,050
LE0291 #10 Y:2009 Utilize higher efficiency lamps and/or ballasts $5,803 $19,856
LE0291 #09 Y:2009 Utilize higher efficiency lamps and/or ballasts $26,236 $81,400
LE0291 #08 Y:2009 Reduce the pressure of compressed air to the minimum required $1,836 $560
LE0291 #07 Y:2009 Install vinyl strip / high speed / air curtain doors $1,975 $3,460
LE0291 #06 Y:2009 Install timers and/or thermostats $2,837 $125
LE0291 #05 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $5,439 $1,600
LE0291 #04 Y:2009 Utilize energy-efficient belts and other improved mechanisms $6,457 $1,120
LE0291 #03 Y:2009 Reschedule plant operations or reduce load to avoid peaks $15,557 $2,500