Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Coated and finished woven and non-woven materials
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 200,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 1,440
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,418 1,173,600
kWh
Electricity Demand $92,871 7,508
kW-mo/yr
Electricity Fees $8,608 -
Natural Gas $347,467 25,094
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $110,550 $270,000 - $110,550
-
MMBtu
02 2.1223: Install smaller boiler (increase high fire duty cycle) $37,210 $68,000 - $37,210
-
MMBtu
03 2.7314: Reduce ventilation air $16,188 $752 $2,453
23,365
kWh
$13,735
-
MMBtu
04 2.2153: Close off unneeded steam lines $3,551 $500 - $3,551
-
MMBtu
05 2.2511: Insulate bare equipment $2,840 $7,510 - $2,840
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,375 $6,125 $2,375
22,622
kWh
-
TOTAL RECOMMENDED $172,714 $352,887 $4,828
45,987
kWh
$167,886
-
MMBtu
TOTAL IMPLEMENTED $19,028 $8,262 $2,453
23,365
kWh
$16,575
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs