Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing and fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2506 #08 Y:2024 Replace existing hvac unit with high efficiency model $7,930 $80,003
LS2506 #07 Y:2024 Use solar heat to make electricty $51,703 $514,800
LS2506 #06 Y:2024 Consider power loss as well as initial loads and load growth in down-sizing transformers $3,451 $15,964
LS2506 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,396 $9,990
LS2506 #04 Y:2024 Improve combustion control capability $24,849 $20,250
LS2506 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $427 $50
LS2506 #02 Y:2024 Install occupancy sensors $4,511 $500
LS2506 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,596 $135
KS2434 #06 Y:2024 Use solar heat to make electricty $48,853 $469,862
KS2434 #05 Y:2024 Replace existing hvac unit with high efficiency model $7,512 $73,720
KS2434 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,537 $6,440
KS2434 #03 Y:2024 Install / repair insulation on condensate lines $1,889 $6,569
KS2434 #02 Y:2024 Install / repair insulation on steam lines $13,772 $52,090
KS2434 #01 Y:2024 Repair and eliminate steam leaks $2,723 $1,383
SU0556 #17 Y:2024 Use solar heat to make electricty $240,268 $897,305
SU0556 #16 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $9,480 $25,942
SU0556 #15 Y:2024 Install occupancy sensors $557 $1,283
SU0556 #14 Y:2024 Conserve energy by efficient use of vending machines $402 $537
SU0556 #13 Y:2024 Utilize higher efficiency lamps and/or ballasts $766 $771
SU0556 #12 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $12,916 $12,528