| Assessment Year | 2024 |
|---|---|
| Principal Product | Dyed Fabrics |
| NAICS | 313310: Textile and Fabric Finishing Mills |
| SIC | 2269: Finishers of Textiles, Not elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
330,000
ft2
|
| Annual Production | 15,000,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $380,754 | 5,778,745 |
kWh
|
$0.066 | |
| Electricity Demand | $85,907 | 18,460 |
kW-mo/yr
|
$4.65 | |
| Natural Gas | $122,694 | 17,754 |
MMBtu
|
$6.91 | |
| Waste Disposal Costs | |||||
| Water Usage | $363,646 | 109,030 |
Tgal
|
$3.34 | |
| Water Disposal | $464,711 | 109,030 |
Tgal
|
$4.26 | |
| TOTAL YEARLY COSTS | $1,417,712 | ||||
| RECOMMENDED SAVINGS* | $78,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $2,723 | $1,383 | - | - |
$2,723
-
MMBtu
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $13,772 | $52,090 | - | - |
$13,772
-
MMBtu
|
|
| 03 | 2.2122: Install / repair insulation on condensate lines | $1,889 | $6,569 | - | - |
$1,889
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,537 | $6,440 |
$2,717
41,160
kWh
|
$820
-
kW-mo/yr
|
- | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $7,512 | $73,720 |
$5,280
80,000
kWh
|
$2,232
-
kW-mo/yr
|
- | |
| 06 | 2.9114: Use solar heat to make electricty | $48,853 | $469,862 |
$44,782
668,984
kWh
|
$4,071
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $78,286 | $610,064 |
$52,779
790,144
kWh
|
$7,123
-
kW-mo/yr
|
$18,384
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs