Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonwoven fabric mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2508 #09 Y:2025 Use solar heat to make electricty $36,405 $305,296
UL2508 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,751 $375
UL2508 #07 Y:2025 Use waste heat from hot flue gases to preheat $43,597 $30,000
UL2508 #06 Y:2025 Install occupancy sensors $55 $237
UL2508 #05 Y:2025 Install spectral reflectors / delamp $141 -
UL2508 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,012 $3,773
UL2508 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,829 $840
UL2508 #02 Y:2025 Replace existing equipment with more suitable substitutes $53,908 $84,265
UL2508 #01 Y:2025 Optimize plant power factor $25,350 $14,859
SU0530 #07 Y:2023 Use solar heat to make electricty $4,126 $28,596
SU0530 #06 Y:2023 Install vinyl strip / high speed / air curtain doors $3,193 $21,150
SU0530 #05 Y:2023 Install vinyl strip / high speed / air curtain doors $2,131 $8,940
SU0530 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,441 $6,444
SU0530 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $283 $402
SU0530 #02 Y:2023 Install compressor air intakes in coolest locations $2,608 $1,343
SU0530 #01 Y:2023 Improve air circulation with destratification fans / other methods $3,551 $211
KS2310 #07 Y:2023 Use solar heat to make electricty $53,035 $420,746
KS2310 #06 Y:2023 Upgrade obsolete equipment $8,217 $52,431
KS2310 #05 Y:2023 Install occupancy sensors $4,144 $13,970
KS2310 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $264 $236