Assessment Year | 2023 |
---|---|
Principal Product | Nonwoven Fabrics |
NAICS | 313230: Nonwoven Fabric Mills |
SIC | 2297: Non-woven Fabrics |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
65,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $531,551 | 6,493,680 |
kWh
|
$0.082 | |
Natural Gas | $23,803 | 4,481 |
MMBtu
|
$5.31 | |
Waste Disposal Costs | |||||
Water Usage | $3,482 | 1,142 |
Tgal
|
$3.05 | |
Water Disposal | $3,482 | 1,142 |
Tgal
|
$3.05 | |
TOTAL YEARLY COSTS | $562,318 | ||||
RECOMMENDED SAVINGS* | $79,681 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2515: Use optimum thickness insulation | $6,101 | $3,005 | - |
$6,101
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,786 | $5,960 |
$6,786
82,759
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,134 | $60 |
$1,134
13,834
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $264 | $236 |
$264
3,221
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $4,144 | $13,970 |
$2,922
35,640
kWh
|
- | $1,222 | |
06 | 2.4321: Upgrade obsolete equipment | $8,217 | $52,431 |
$8,217
100,217
kWh
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $53,035 | $420,746 |
$53,035
646,763
kWh
|
- | - | |
TOTAL RECOMMENDED | $79,681 | $496,408 |
$72,358
882,434
kWh
|
$6,101
-
MMBtu
|
$1,222 | ||
TOTAL IMPLEMENTED | $14,318 | $55,436 |
$8,217
100,217
kWh
|
$6,101
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs