| Assessment Year | 2023 |
|---|---|
| Principal Product | Nonwoven Fabrics |
| NAICS | 313230: Nonwoven Fabric Mills |
| SIC | 2297: Non-woven Fabrics |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
65,000
ft2
|
| Annual Production | 5,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $531,551 | 6,493,680 |
kWh
|
$0.082 | |
| Natural Gas | $23,803 | 4,481 |
MMBtu
|
$5.31 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,482 | 1,142 |
Tgal
|
$3.05 | |
| Water Disposal | $3,482 | 1,142 |
Tgal
|
$3.05 | |
| TOTAL YEARLY COSTS | $562,318 | ||||
| RECOMMENDED SAVINGS* | $79,681 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $14,318 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2515: Use optimum thickness insulation | $6,101 | $3,005 | - |
$6,101
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,786 | $5,960 |
$6,786
82,759
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,134 | $60 |
$1,134
13,834
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $264 | $236 |
$264
3,221
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $4,144 | $13,970 |
$2,922
35,640
kWh
|
- | $1,222 | |
| 06 | 2.4321: Upgrade obsolete equipment | $8,217 | $52,431 |
$8,217
100,217
kWh
|
- | - | |
| 07 | 2.9114: Use solar heat to make electricty | $53,035 | $420,746 |
$53,035
646,763
kWh
|
- | - | |
| TOTAL RECOMMENDED | $79,681 | $496,408 |
$72,358
882,434
kWh
|
$6,101
-
MMBtu
|
$1,222 | ||
| TOTAL IMPLEMENTED | $14,318 | $55,436 |
$8,217
100,217
kWh
|
$6,101
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs