ITAC Assessment: RU0019
ITAC logo
ITAC Assessment: RU0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FOOD SERVICE HARDWARE
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 25,000,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,491 3,274,033
kWh
Natural Gas $157,239 29,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,019 $209 $4,019
59,789
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,164 - $4,164
62,134
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,736 $302 $1,736
25,791
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $3,847 $5,040 $(-446.0)
(-6,741)
kWh
$4,293
-
MMBtu
05 2.4312: Improve lubrication practices $764 $800 $764
11,430
kWh
-
06 2.2514: Cover open tanks $2,983 $200 $2,983
44,549
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,725 - $6,725
100,528
kWh
-
TOTAL RECOMMENDED $24,238 $6,551 $19,945
297,480
kWh
$4,293
-
MMBtu
TOTAL IMPLEMENTED $20,391 $1,511 $20,391
304,221
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs