Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Broadwoven fabric mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0564 #08 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $1,605 $12,000
SU0564 #07 Y:2024 Install occupancy sensors $124 $723
SU0564 #06 Y:2024 Install back-up equipment $32,534 $169,100
SU0564 #05 Y:2024 Install compressor air intakes in coolest locations $4,420 $332
SU0564 #04 Y:2024 Recover waste heat from equipment $3,312 $118
SU0564 #03 Y:2024 Eliminate or reduce compressed air usage $3,941 -
SU0564 #02 Y:2024 Pay bills on time to avoid late fees $1,442 -
SU0564 #01 Y:2024 Disconnect ballasts $103 -
GT0970 #06 Y:2023 Use solar heat to make electricty $70,120 $1,934,090
GT0970 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $93,953 $385,000
GT0970 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $268 $456
GT0970 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,675 $1,850
GT0970 #02 Y:2023 Install vinyl strip / high speed / air curtain doors $4,613 $75
GT0970 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $37,757 $200
CM1017 #07 Y:2023 Replace fossil fuel equipment with electrical equipment $1,464 $3,500
CM1017 #06 Y:2023 Install system to collect scrap $9,880 $2,306
CM1017 #05 Y:2023 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $1,538 $4,396
CM1017 #04 Y:2023 Replace boiler $20,045 $41,481
CM1017 #03 Y:2023 Replace existing chiller with high efficiency model $1,890 $15,750
CM1017 #02 Y:2023 Turn off equipment when not in use $738 -