24
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0970 #06 Y:2023 | 06 | 2023 | Use solar heat to make electricty | $70,120 | $1,934,090 | |
| GT0970 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $93,953 | $385,000 | |
| GT0970 #04 Y:2023 | 04 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $268 | $456 | |
| GT0970 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,675 | $1,850 | |
| GT0970 #02 Y:2023 | 02 | 2023 | Install vinyl strip / high speed / air curtain doors | $4,613 | $75 | |
| GT0970 #01 Y:2023 | 01 | 2023 | Reduce the pressure of compressed air to the minimum required | $37,757 | $200 | |
| NC0566 #12 Y:2016 | 12 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $3,706 | $230 | |
| NC0566 #11 Y:2016 | 11 | 2016 | Develop a repair/replace policy | $4,453 | $4,256 | |
| NC0566 #10 Y:2016 | 10 | 2016 | Analyze flue gas for proper air/fuel ratio | $4,287 | $2,000 | |
| NC0566 #09 Y:2016 | 09 | 2016 | Repair and eliminate steam leaks | $2,230 | $1,000 | |
| NC0566 #08 Y:2016 | 08 | 2016 | Recover waste heat from equipment | $6,802 | $12,000 | |
| NC0566 #07 Y:2016 | 07 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $788 | $200 | |
| NC0566 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $2,988 | $100 | |
| NC0566 #05 Y:2016 | 05 | 2016 | Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $107,179 | $300,000 | |
| NC0566 #04 Y:2016 | 04 | 2016 | Avoid introducing hot, humid, or dirty air into hvac system | $52,211 | $10,000 | |
| NC0566 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $3,757 | $5,000 | |
| NC0566 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $54,183 | $44,349 | |
| NC0566 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $231,779 | $419,073 | |
| NC0274 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $1,705 | $2,885 | |
| NC0274 #05 Y:2003 | 05 | 2003 | Reduce illumination to minimum necessary levels | $5,021 | $1,000 |