Assessment Year | 2003 |
---|---|
Principal Product | woven fabrics |
NAICS | 313210: Broadwoven Fabric Mills |
SIC | 2210: |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
250,000
ft2
|
Annual Production | 630,000
thousand feet
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $857,557 | 28,467,236 |
kWh
|
$0.030 |
Natural Gas | $133,157 | 33,440 |
MMBtu
|
$3.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,955 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,230 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,125 | $77,500 |
$13,197
561,580
kWh
|
$4,928
-
kW-mo/yr
|
- | - | - | |
02 | 2.7233: Use properly designed and sized hvac equipment | $36,152 | $81,000 |
$17,452
742,628
kWh
|
$13,700
-
kW-mo/yr
|
$5,000 | - | - | |
03 | 2.2625: Chill water to the highest temperature possible | $1,209 | $200 |
$500
21,271
kWh
|
$709
-
kW-mo/yr
|
- | - | - | |
04 | 3.3128: Utilize other methods to remove contaminants | $9,743 | $36,000 |
$(-290.0)
(-12,352)
kWh
|
$(-109.0)
-
kW-mo/yr
|
- | $9,752 |
$390
-
Tgal
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $5,021 | $1,000 |
$3,632
154,560
kWh
|
$1,389
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,705 | $2,885 |
$1,272
54,136
kWh
|
$433
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $71,955 | $198,585 |
$35,763
1,521,823
kWh
|
$21,050
-
kW-mo/yr
|
$5,000 | $9,752 |
$390
-
Tgal
|
||
TOTAL IMPLEMENTED | $6,230 | $1,200 |
$4,132
175,831
kWh
|
$2,098
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs