ITAC Assessment: NC0274
ITAC logo
ITAC Assessment: NC0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product woven fabrics
NAICS 313210: Broadwoven Fabric Mills
SIC 2210:
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 630,000
thousand feet
Production Hrs. Annual 8,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $857,557 28,467,236
kWh
Natural Gas $133,157 33,440
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,125 $77,500 $13,197
561,580
kWh
$4,928
-
kW-mo/yr
- - -
02 2.7233: Use properly designed and sized hvac equipment $36,152 $81,000 $17,452
742,628
kWh
$13,700
-
kW-mo/yr
$5,000 - -
03 2.2625: Chill water to the highest temperature possible $1,209 $200 $500
21,271
kWh
$709
-
kW-mo/yr
- - -
04 3.3128: Utilize other methods to remove contaminants $9,743 $36,000 $(-290.0)
(-12,352)
kWh
$(-109.0)
-
kW-mo/yr
- $9,752 $390
-
Tgal
05 2.7111: Reduce illumination to minimum necessary levels $5,021 $1,000 $3,632
154,560
kWh
$1,389
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,705 $2,885 $1,272
54,136
kWh
$433
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $71,955 $198,585 $35,763
1,521,823
kWh
$21,050
-
kW-mo/yr
$5,000 $9,752 $390
-
Tgal
TOTAL IMPLEMENTED $6,230 $1,200 $4,132
175,831
kWh
$2,098
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs