matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WM0247 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,959 | $1,750 |
n/a
|
WM0247 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $2,062 | - |
n/a
|
WM0247 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,444 | $1,640 |
n/a
|
WM0247 #03 Y:2025 | 03 | 2025 | Reduce space conditioning during non-working hours | $2,473 | $2,950 |
n/a
|
WM0247 #02 Y:2025 | 02 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $2,533 | $1,020 |
n/a
|
WM0247 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $7,641 | - |
n/a
|
UL2508 #09 Y:2025 | 09 | 2025 | Use solar heat to make electricty | $36,405 | $305,296 |
n/a
|
UL2508 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,751 | $375 |
n/a
|
UL2508 #07 Y:2025 | 07 | 2025 | Use waste heat from hot flue gases to preheat | $43,597 | $30,000 |
n/a
|
UL2508 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $55 | $237 |
n/a
|
UL2508 #05 Y:2025 | 05 | 2025 | Install spectral reflectors / delamp | $141 | - |
n/a
|
UL2508 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,012 | $3,773 |
n/a
|
UL2508 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,829 | $840 |
n/a
|
UL2508 #02 Y:2025 | 02 | 2025 | Replace existing equipment with more suitable substitutes | $53,908 | $84,265 |
n/a
|
UL2508 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $25,350 | $14,859 |
n/a
|
SU0564 #08 Y:2024 | 08 | 2024 | Adjust / maintain fork lift trucks for most efficient operation | $1,605 | $12,000 | |
SU0564 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $124 | $723 | |
SU0564 #06 Y:2024 | 06 | 2024 | Install back-up equipment | $32,534 | $169,100 | |
SU0564 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $4,420 | $332 | |
SU0564 #04 Y:2024 | 04 | 2024 | Recover waste heat from equipment | $3,312 | $118 |