Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fiber, yarn, and thread mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0962 #06 Y:2022 Use solar heat to make electricty $169,075 $2,808,032
GT0962 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $14,615 $35,774
GT0962 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $12,117 $13,039
GT0962 #03 Y:2022 Reduce the pressure of compressed air to the minimum required $9,943 $800
GT0962 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $30,443 $1,850
GT0962 #01 Y:2022 Recharge batteries on during off-peak demand periods $5,691 $200
UA0250 #07 Y:2021 Optimize plant power factor $43,918 $57,938
UA0250 #06 Y:2021 Reduce space conditioning during non-working hours $2,456 $450
UA0250 #05 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $8,015 $30,617
UA0250 #04 Y:2021 Shut off cooling if cold outside air will cool process $19,724 $5,000
UA0250 #03 Y:2021 Utilize energy-efficient belts and other improved mechanisms $9,508 $4,445
UA0250 #02 Y:2021 Reduce illumination to minimum necessary levels $14,021 $25,035
UA0250 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $9,394 $34,200
UA0245 #06 Y:2021 Reduce space conditioning during non-working hours $317 $450
UA0245 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $10,365 $250
UA0245 #04 Y:2021 Utilize energy-efficient belts and other improved mechanisms $8,257 $1,579
UA0245 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $21,374 $22,712
UA0245 #02 Y:2021 Use photocell controls $323 $197
UA0245 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $45,808 $43,308
WV0614 #09 Y:2021 Eliminate or reduce compressed air usage $1,124 $1,083