ITAC Assessment: UA0250
ITAC logo
ITAC Assessment: UA0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 468,888
ft2
Annual Production 68,819,636
lb
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,299,865 122,531,495
kWh
Electricity Demand $2,535,147 182,042
kW-mo/yr
Electricity Fees $(-414,308.0) -
TOTAL YEARLY COSTS $6,420,704
RECOMMENDED SAVINGS* $107,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,015

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,394 $34,200 $6,282
178,984
kWh
$3,718
-
kW-mo/yr
$(-606.0)
02 2.7111: Reduce illumination to minimum necessary levels $14,021 $25,035 $8,796
250,589
kWh
$6,129
-
kW-mo/yr
$(-904.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,508 $4,445 $6,437
183,384
kWh
$3,684
-
kW-mo/yr
$(-613.0)
04 2.2691: Shut off cooling if cold outside air will cool process $19,724 $5,000 $20,997
598,340
kWh
- $(-1,273.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,015 $30,617 $5,537
157,743
kWh
$2,995
-
kW-mo/yr
$(-517.0)
06 2.7224: Reduce space conditioning during non-working hours $2,456 $450 $2,614
74,482
kWh
- $(-158.0)
07 2.3212: Optimize plant power factor $43,918 $57,938 - - $43,918
TOTAL RECOMMENDED $107,036 $157,685 $50,663
1,443,522
kWh
$16,526
-
kW-mo/yr
$39,847
TOTAL IMPLEMENTED $93,015 $132,650 $41,867
1,192,933
kWh
$10,397
-
kW-mo/yr
$40,751
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs