Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Distilleries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2413 #05 Y:2024 Use outside cold water source as a supply of cooling water $204,012 $328,582
UL2413 #04 Y:2024 Use solar heat to make electricty $96,023 $1,156,200
UL2413 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $20,471 $19,500
UL2413 #02 Y:2024 Recover waste heat from equipment $45,007 $52,000
UL2413 #01 Y:2024 Lower ceiling to reduce conditioned space $894 $5,000
OR0753 #03 Y:2022 Use solar heat to make electricty $14,927 $278,534
OR0753 #02 Y:2022 Replace fossil fuel equipment with electrical equipment $9,938 $40,624
OR0753 #01 Y:2022 Modify current incentive program $1,000 -
UK2107 #06 Y:2021 Reduce illumination to minimum necessary levels $3,085 $797
UK2107 #05 Y:2021 Insulate bare equipment $2,733 $2,931
UK2107 #04 Y:2021 Recover heat from exhausted steam, hot air or hot water $2,257 $1,770
UK2107 #03 Y:2021 Utilize energy-efficient belts and other improved mechanisms $662 $150
UK2107 #02 Y:2021 Eliminate or reduce compressed air usage $4,788 -
UK2107 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $11,932 $3,950
UK2106 #11 Y:2021 Replace fossil fuel equipment with electrical equipment $10,154 $600
UK2106 #10 Y:2021 Insulate bare equipment $1,250 $881
UK2106 #09 Y:2021 Preheat combustion air with waste heat $49,643 $75,000
UK2106 #08 Y:2021 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $731,255 $3,500,000
UK2106 #07 Y:2021 Install occupancy sensors $1,142 $640
UK2106 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $267 $100