ITAC Assessment: UL2413
ITAC logo
ITAC Assessment: UL2413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Distilled Spirits
NAICS 312140: Distilleries
SIC 2085: Distilled and Blended Liquors
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 108,850
ft2
Annual Production 7,315
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $613,745 10,261,500
kWh
Electricity Demand $147,575 21,173
kW-mo/yr
Electricity Fees $230,742 -
Natural Gas $1,003,592 235,429
MMBtu
Waste Disposal Costs
Water Usage $547,392 65,034
Tgal
TOTAL YEARLY COSTS $2,543,046
RECOMMENDED SAVINGS* $366,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7292: Lower ceiling to reduce conditioned space $894 $5,000 $894
14,950
kWh
- - -
02 2.2437: Recover waste heat from equipment $45,007 $52,000 - - $45,007
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,471 $19,500 $20,471
342,265
kWh
- - -
04 2.9114: Use solar heat to make electricty $96,023 $1,156,200 $79,563
1,330,260
kWh
$16,460
-
kW-mo/yr
- -
05 2.2692: Use outside cold water source as a supply of cooling water $204,012 $328,582 $112,128
1,874,685
kWh
$52,680
-
kW-mo/yr
- $39,204
-
Tgal
TOTAL RECOMMENDED $366,407 $1,561,282 $213,056
3,562,160
kWh
$69,140
-
kW-mo/yr
$45,007
-
MMBtu
$39,204
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs