ITAC Assessment: TN0281
ITAC logo
ITAC Assessment: TN0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product GOLF CLUBS
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 1,650,000
pieces
Production Hrs. Annual 3,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,883 2,520,809
kWh
Natural Gas $121,014 24,464
MMBtu
Fuel Oil #2 $6,299 1,028
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2136: Install / repair insulation on steam lines $6,608 $4,408 - $6,280
-
MMBtu
$328
-
MMBtu
02 2.2514: Cover open tanks $5,049 $650 - $4,798
-
MMBtu
$251
-
MMBtu
03 2.2511: Insulate bare equipment $4,465 $1,491 - $4,243
-
MMBtu
$222
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $4,415 $7,500 - $4,194
-
MMBtu
$221
-
MMBtu
05 2.6122: Adjust vents to minimize energy use $3,340 - $3,340
63,013
kWh
- -
06 2.2122: Install / repair insulation on condensate lines $529 $182 - $503
-
MMBtu
$26
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $105 $1,025
19,343
kWh
- -
08 2.6212: Turn off equipment during breaks, reduce operating time $737 $220 $737
13,775
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $674 $240 $674
12,603
kWh
- -
10 2.6212: Turn off equipment during breaks, reduce operating time $93 - $93
1,758
kWh
- -
TOTAL RECOMMENDED $26,935 $14,796 $5,869
110,492
kWh
$20,018
-
MMBtu
$1,048
-
MMBtu
TOTAL IMPLEMENTED $11,066 $4,513 $4,458
84,114
kWh
$6,280
-
MMBtu
$328
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs