ITAC Assessment: AM0833
ITAC logo
ITAC Assessment: AM0833
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product High Performance Molded Seals & Gaskets
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 28,000
ft2
Annual Production 660,000
pieces
Production Hrs. Annual 8,056
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,364 2,521,800
kWh
Electricity Demand $28,406 4,734
kW-mo/yr
Electricity Fees $25,498 -
Waste Disposal Costs
Water Usage $1,699 486
Tgal
Water Disposal $2,218 486
Tgal
TOTAL YEARLY COSTS $216,185
RECOMMENDED SAVINGS* $91,936 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $80,120 $8,000 - - $16,024 - $64,096
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,337 $9,462 $5,551
81,637
kWh
$730
-
kW-mo/yr
- $56 -
03 2.7135: Install occupancy sensors $71 $90 $71
1,044
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $1,930 $950
14,000
kWh
- - $50 -
05 2.7134: Use photocell controls $457 $410 $457
6,728
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,688 $529 $241
3,548
kWh
$29
-
kW-mo/yr
- $1,418 -
07 2.4231: Reduce the pressure of compressed air to the minimum required $390 $15 $330
4,860
kWh
$60
-
kW-mo/yr
- - -
08 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,873 $930 $1,873
27,538
kWh
- - - -
TOTAL RECOMMENDED $91,936 $21,366 $9,473
139,355
kWh
$819
-
kW-mo/yr
$16,024 $1,524 $64,096
TOTAL IMPLEMENTED $90,936 $19,436 $8,523
125,355
kWh
$819
-
kW-mo/yr
$16,024 $1,474 $64,096
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs