ITAC Assessment: MA0007
ITAC logo
ITAC Assessment: MA0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product THERMOFORMED SHEET
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $1
M
to 5
M
# of Employees 68
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,459 911,782
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $543 $650 $543
4,689
kWh
-
02 2.2444: Use hot process fluids to preheat incoming process fluids $5,690 $3,000 $5,690
48,945
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $34,692 $70,668 $70,227
607,268
kWh
$(-35,535.0)
-
MMBtu
TOTAL RECOMMENDED $40,925 $74,318 $76,460
660,902
kWh
$(-35,535.0)
-
MMBtu
TOTAL IMPLEMENTED $6,233 $3,650 $6,233
53,634
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs