ITAC Assessment: SU0350
ITAC logo
ITAC Assessment: SU0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Medical Diagnostics Products
NAICS 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $100
M
to 500
M
# of Employees 910
Plant Area 300,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $529,827 11,297,580
kWh
Electricity Demand $301,845 25,379
kW-mo/yr
Electricity Fees $12,689 -
Natural Gas $217,199 34,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $10,408 - - - $10,408
-
MMBtu
-
02 3.5316: Contract a wood pallet recycling company $8,049 - - - - $8,049
03 4.821: Pay bills on time to avoid late fees $1,239 - - - - $1,239
04 2.7132: Install timers on light switches in little used areas $30,158 $131 $30,158
641,555
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $741 $191 $313
6,656
kWh
$428
-
kW-mo/yr
- -
06 2.2123: Insulate feedwater tank $579 $190 - - $579
-
MMBtu
-
07 2.2136: Install / repair insulation on steam lines $579 $340 - - $579
-
MMBtu
-
08 3.1161: Eliminate/reduce an operation $18,624 $29,949 $(-88.0)
(-1,875)
kWh
$(-642.0)
-
kW-mo/yr
- $19,354
09 2.7142: Utilize higher efficiency lamps and/or ballasts $347 $771 $290
6,176
kWh
$57
-
kW-mo/yr
- -
10 2.7243: Improve air circulation with destratification fans / other methods $298 $705 $(-53.0)
(-1,121)
kWh
$(-3.0)
-
kW-mo/yr
$354
-
MMBtu
-
11 2.6211: Conserve energy by efficient use of vending machines $221 $616 $221
4,693
kWh
- - -
12 2.4321: Upgrade obsolete equipment $189 $852 $130
2,756
kWh
$59
-
kW-mo/yr
- -
TOTAL RECOMMENDED $71,432 $33,745 $30,971
658,840
kWh
$(-101.0)
-
kW-mo/yr
$11,920
-
MMBtu
$28,642
TOTAL IMPLEMENTED $52,510 $3,091 $31,112
661,836
kWh
$544
-
kW-mo/yr
$11,566
-
MMBtu
$9,288
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs