Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

515

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Wineries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0045 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $26,986 -
SJ0045 #06 Y:2026 Insulate bare equipment $37,880 $17,625
SJ0045 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,865 $1,023
SJ0045 #04 Y:2026 Adopt in-house material generation $357,338 $572,004
SJ0045 #03 Y:2026 Use solar heat to make electricty $125,925 $1,344,513
SJ0045 #02 Y:2026 Modify refrigeration system to operate at a lower pressure $61,426 $144,392
SJ0045 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $6,874 $29,414
SF0645 #09 Y:2025 Purchase new equipment to reduce material use / cost $41,828 $26,380
SF0645 #08 Y:2025 Use solar heat to make electricty $78,810 $448,680
SF0645 #07 Y:2025 Utilize controls to operate equipment only when needed $1,516 $4,420
SF0645 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,551 $15,612
SF0645 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,130 $4,629
SF0645 #04 Y:2025 Reduce space conditioning during non-working hours $1,021 $993
SF0645 #03 Y:2025 Recharge batteries on during off-peak demand periods $1,633 $1,533
SF0645 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,136 -
SF0645 #01 Y:2025 Turn off equipment when not in use $16,596 -
SF0643 #09 Y:2025 Use solar heat to make electricty $1,826,449 $12,059,302
SF0643 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,070 $30,818
SF0643 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $46,662 $211,375
SF0643 #06 Y:2025 Insulate bare equipment $818 $3,408