ITAC Assessment: SF0631
ITAC logo
ITAC Assessment: SF0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 90
Plant Area 518,000
ft2
Annual Production 50,000
ton
Production Hrs. Annual 1,536
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $766,396 4,350,931
kWh
Electricity Demand $145,845 7,821
kW-mo/yr
Natural Gas $284,542 17,123
MMBtu
TOTAL YEARLY COSTS $1,196,783
RECOMMENDED SAVINGS* $89,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,844 - $19,044
108,135
kWh
- - $(-1,200.0)
02 2.7224: Reduce space conditioning during non-working hours $16,164 $441 $7,355
41,765
kWh
- $8,809
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $768 $122 $671
3,810
kWh
$97
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $523 $419 - - $523
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,321 $6,254 $7,321
41,572
kWh
- - -
06 2.4226: Use / purchase optimum sized compressor $42,980 $125,625 $37,424
222,515
kWh
$5,556
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $4,255 $13,190 - - $4,255
-
MMBtu
-
TOTAL RECOMMENDED $89,855 $146,051 $71,815
417,797
kWh
$5,653
-
kW-mo/yr
$13,587
-
MMBtu
$(-1,200.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs