Assessment Year | 1997 |
---|---|
Principal Product | Filters |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
193,300
ft2
|
Annual Production | 72,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $347,501 | 7,769,051 |
kWh
|
$0.045 |
Electricity Demand | $199,314 | 16,159 |
kW-mo/yr
|
$12.33 |
Electricity Fees | $19,072 | - |
|
- |
Natural Gas | $119,904 | 21,775 |
MMBtu
|
$5.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,669 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,814 | $7,298 | n/a |
$4,219
94,373
kWh
|
$1,595
-
kW-mo/yr
|
- | - |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,074 | $21,501 | n/a |
$7,863
175,850
kWh
|
$6,211
-
kW-mo/yr
|
- | - |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,885 | $829 | n/a |
$2,885
64,478
kWh
|
- | - | - |
04 | 2.2437: Recover waste heat from equipment | $1,355 | $693 | n/a | - | - |
$1,355
-
MMBtu
|
- |
05 | 2.7314: Reduce ventilation air | $3,070 | $1,630 | n/a |
$1,750
38,980
kWh
|
$1,320
-
kW-mo/yr
|
- | - |
06 | 3.5112: Reprocess spent oils on site for re-use | $471 | - | n/a | - | - | - |
$471
-
gal
|
TOTAL RECOMMENDED | $27,669 | $31,951 |
$16,717
373,681
kWh
|
$9,126
-
kW-mo/yr
|
$1,355
-
MMBtu
|
$471
-
gal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs