ITAC Assessment: OD0097
ITAC logo
ITAC Assessment: OD0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 193,300
ft2
Annual Production 72,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,501 7,769,051
kWh
Electricity Demand $199,314 16,159
kW-mo/yr
Electricity Fees $19,072 -
Natural Gas $119,904 21,775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.4133: Use most efficient type of electric motors $5,814 $7,298 n/a $4,219
94,373
kWh
$1,595
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,074 $21,501 n/a $7,863
175,850
kWh
$6,211
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,885 $829 n/a $2,885
64,478
kWh
- - -
04 2.2437: Recover waste heat from equipment $1,355 $693 n/a - - $1,355
-
MMBtu
-
05 2.7314: Reduce ventilation air $3,070 $1,630 n/a $1,750
38,980
kWh
$1,320
-
kW-mo/yr
- -
06 3.5112: Reprocess spent oils on site for re-use $471 - n/a - - - $471
-
gal
TOTAL RECOMMENDED $27,669 $31,951 $16,717
373,681
kWh
$9,126
-
kW-mo/yr
$1,355
-
MMBtu
$471
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs