| Assessment Year | 1993 |
|---|---|
| Principal Product | Metal Plating |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
16,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,265
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $49,710 | 662,954 |
kWh
|
$0.075 |
| Natural Gas | $30,316 | 4,971 |
MMBtu
|
$6.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,146 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,531 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $3,971 | $4,811 | - |
$3,971
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,894 | - |
$2,419
22,860
kWh
|
$(-525.0)
-
MMBtu
|
|
| 03 | 2.2122: Install / repair insulation on condensate lines | $1,507 | $390 | - |
$1,507
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,159 | $400 | - |
$1,159
-
MMBtu
|
|
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $972 | - |
$1,240
11,723
kWh
|
$(-268.0)
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $899 | $372 |
$899
8,499
kWh
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $496 | $1,227 |
$496
4,689
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $248 | $176 |
$248
2,345
kWh
|
- | |
| TOTAL RECOMMENDED | $11,146 | $7,376 |
$5,302
50,116
kWh
|
$5,844
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,531 | $5,601 |
$2,419
22,860
kWh
|
$6,112
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs