Assessment Year | 1993 |
---|---|
Principal Product | Metal Plating |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
16,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 5,265
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,710 | 662,954 |
kWh
|
$0.075 |
Natural Gas | $30,316 | 4,971 |
MMBtu
|
$6.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,146 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $3,971 | $4,811 | - |
$3,971
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,894 | - |
$2,419
22,860
kWh
|
$(-525.0)
-
MMBtu
|
|
03 | 2.2122: Install / repair insulation on condensate lines | $1,507 | $390 | - |
$1,507
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,159 | $400 | - |
$1,159
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $972 | - |
$1,240
11,723
kWh
|
$(-268.0)
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $899 | $372 |
$899
8,499
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $496 | $1,227 |
$496
4,689
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $248 | $176 |
$248
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $11,146 | $7,376 |
$5,302
50,116
kWh
|
$5,844
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,531 | $5,601 |
$2,419
22,860
kWh
|
$6,112
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs