ITAC Assessment: MA0270
ITAC logo
ITAC Assessment: MA0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Metal Plating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 16,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,265
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,710 662,954
kWh
Natural Gas $30,316 4,971
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $3,971 $4,811 - $3,971
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,894 - $2,419
22,860
kWh
$(-525.0)
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $1,507 $390 - $1,507
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,159 $400 - $1,159
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $972 - $1,240
11,723
kWh
$(-268.0)
-
MMBtu
06 2.7135: Install occupancy sensors $899 $372 $899
8,499
kWh
-
07 2.4133: Use most efficient type of electric motors $496 $1,227 $496
4,689
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $248 $176 $248
2,345
kWh
-
TOTAL RECOMMENDED $11,146 $7,376 $5,302
50,116
kWh
$5,844
-
MMBtu
TOTAL IMPLEMENTED $8,531 $5,601 $2,419
22,860
kWh
$6,112
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs