| Assessment Year | 1999 |
|---|---|
| Principal Product | corrugated containers |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 230 |
| Plant Area |
430,000
ft2
|
| Annual Production | 20,000,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $84,005 | 4,285,756 |
kWh
|
$0.020 |
| Electricity Demand | $150,713 | 11,002 |
kW-mo/yr
|
$13.70 |
| Electricity Fees | $635 | - |
|
- |
| Natural Gas | $104,032 | 31,507 |
MMBtu
|
$3.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $178,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,300 | $7,500 | - |
$10,300
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,280 | $1,000 |
$810
43,376
kWh
|
$1,470
-
kW-mo/yr
|
- | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,190 | $2,720 | - | - |
$1,190
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $90 | $958 |
$230
12,603
kWh
|
$340
-
kW-mo/yr
|
- | $(-480.0) | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $790 | $1,650 |
$290
15,826
kWh
|
$500
-
kW-mo/yr
|
- | - | |
| 06 | 4.131: Modify process to reduce material use/cost | $104,000 | $1,500 | - | - | - | $104,000 | |
| 07 | 4.125: | $59,470 | $20,000 | - | - | - | $59,470 | |
| TOTAL RECOMMENDED | $178,120 | $35,328 |
$1,330
71,805
kWh
|
$12,610
-
kW-mo/yr
|
$1,190
-
MMBtu
|
$162,990 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs