ITAC Assessment: CO0437
ITAC logo
ITAC Assessment: CO0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 430,000
ft2
Annual Production 20,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,005 4,285,756
kWh
Electricity Demand $150,713 11,002
kW-mo/yr
Electricity Fees $635 -
Natural Gas $104,032 31,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,300 $7,500 - $10,300
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,280 $1,000 $810
43,376
kWh
$1,470
-
kW-mo/yr
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,190 $2,720 - - $1,190
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $90 $958 $230
12,603
kWh
$340
-
kW-mo/yr
- $(-480.0)
05 2.4221: Install compressor air intakes in coolest locations $790 $1,650 $290
15,826
kWh
$500
-
kW-mo/yr
- -
06 4.131: Modify process to reduce material use/cost $104,000 $1,500 - - - $104,000
07 4.125: $59,470 $20,000 - - - $59,470
TOTAL RECOMMENDED $178,120 $35,328 $1,330
71,805
kWh
$12,610
-
kW-mo/yr
$1,190
-
MMBtu
$162,990
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs