Assessment Year | 2000 |
---|---|
Principal Product | Sttel Drawer Slides |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 270 |
Plant Area |
160,000
ft2
|
Annual Production | 9,000,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,372 | 4,184,643 |
kWh
|
$0.030 |
Electricity Demand | $104,878 | 10,915 |
kW-mo/yr
|
$9.61 |
Electricity Fees | $(-11,059.0) | - |
|
- |
Natural Gas | $54,061 | 12,580 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,855 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,863 | $9,787 |
$1,344
45,428
kWh
|
$1,519
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.7135: Install occupancy sensors | $681 | $1,600 |
$338
11,430
kWh
|
$343
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $394 | $420 |
$87
2,931
kWh
|
$39
-
kW-mo/yr
|
- | - | $175 | - | $93 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $917 | $50 |
$358
12,016
kWh
|
$159
-
kW-mo/yr
|
- | - | $400 | - | - | - | |
05 | 2.7134: Use photocell controls | $92 | $300 |
$31
1,172
kWh
|
$61
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $302 | $90 |
$103
3,517
kWh
|
$199
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 3.3131: Use evaporation to concentrate material | $746 | $250 | - | - | - |
$746
-
Tgal
|
- | - | - | - | |
08 | 2.8121: Apply for tax-free status for energy purchases | $210 | $200 | - | - | $210 | - | - | - | - | - | |
09 | 3.1244: Reduce solution drag-out to prevent solution loss | $967 | - | - | - | - |
$222
-
Tgal
|
- | $583 | - |
$162
-
Tgal
|
|
TOTAL RECOMMENDED | $7,172 | $12,697 |
$2,261
76,494
kWh
|
$2,320
-
kW-mo/yr
|
$210 |
$968
-
Tgal
|
$575 | $583 | $93 |
$162
-
Tgal
|
||
TOTAL IMPLEMENTED | $4,855 | $11,827 |
$2,174
73,563
kWh
|
$2,281
-
kW-mo/yr
|
- | - | $400 | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs