ITAC Assessment: OR0557
ITAC logo
ITAC Assessment: OR0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Juice and puree concentrates
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 40,000
ft2
Annual Production 66,981,952
units
Production Hrs. Annual 8,424
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,967 2,580,827
kWh
Electricity Demand $31,354 6,555
kW-mo/yr
Natural Gas $344,823 71,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $15,806 $14,882 - $15,806
-
MMBtu
02 2.4133: Use most efficient type of electric motors $5,866 $6,763 $5,866
74,494
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,416 $500 - $4,416
-
MMBtu
04 2.2437: Recover waste heat from equipment $1,893 $3,858 - $1,893
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,655 $1,655 $1,655
20,563
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,035 $3,858 $1,035
8,745
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,471 $1,471 $1,471
18,278
kWh
-
08 2.2136: Install / repair insulation on steam lines $615 $353 - $615
-
MMBtu
09 2.9114: Use solar heat to make electricty $23,079 $87,827 $23,079
295,488
kWh
-
TOTAL RECOMMENDED $55,836 $121,167 $33,106
417,568
kWh
$22,730
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs