Assessment Year | 2025 |
---|---|
Principal Product | Canned and Bottled Wines |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $10 M to 50M |
# of Employees | 18 |
Plant Area |
64,800
ft2
|
Annual Production | 300,000
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,962 | 986,243 |
kWh
|
$0.12 |
Electricity Demand | $156,740 | 3,382 |
kW-mo/yr
|
$46.35 |
Natural Gas | $16,721 | 1,008 |
MMBtu
|
$16.58 |
TOTAL YEARLY COSTS | $289,423 | |||
RECOMMENDED SAVINGS* | $16,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $175 | - |
$175
1,484
kWh
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,209 | - |
$2,109
17,931
kWh
|
- | - | - | $(-900.0) | - | |
03 | 2.6218: Turn off equipment when not in use | $5,219 | $1,820 |
$1,787
15,198
kWh
|
- | - |
$3,432
-
MMBtu
|
- | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $3,453 | $1,560 |
$3,453
29,364
kWh
|
- | - | - | - | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $1,145 | $1,677 | - | - | $1,145 | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,777 | $15,024 |
$1,552
13,205
kWh
|
$3,160
-
kW-mo/yr
|
- | - | $64 | $1 | |
07 | 2.2511: Insulate bare equipment | $290 | $1,834 |
$290
2,468
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $16,268 | $21,915 |
$9,366
79,650
kWh
|
$3,160
-
kW-mo/yr
|
$1,145 |
$3,432
-
MMBtu
|
$(-836.0) | $1 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs