ITAC Assessment: SF0635
ITAC logo
ITAC Assessment: SF0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Canned and Bottled Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area 64,800
ft2
Annual Production 300,000
units
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,962 986,243
kWh
Electricity Demand $156,740 3,382
kW-mo/yr
Natural Gas $16,721 1,008
MMBtu
TOTAL YEARLY COSTS $289,423
RECOMMENDED SAVINGS* $16,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $175 - $175
1,484
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,209 - $2,109
17,931
kWh
- - - $(-900.0) -
03 2.6218: Turn off equipment when not in use $5,219 $1,820 $1,787
15,198
kWh
- - $3,432
-
MMBtu
- -
04 2.6231: Utilize controls to operate equipment only when needed $3,453 $1,560 $3,453
29,364
kWh
- - - - -
05 2.3132: Recharge batteries on during off-peak demand periods $1,145 $1,677 - - $1,145 - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,777 $15,024 $1,552
13,205
kWh
$3,160
-
kW-mo/yr
- - $64 $1
07 2.2511: Insulate bare equipment $290 $1,834 $290
2,468
kWh
- - - - -
TOTAL RECOMMENDED $16,268 $21,915 $9,366
79,650
kWh
$3,160
-
kW-mo/yr
$1,145 $3,432
-
MMBtu
$(-836.0) $1
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs