Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

482

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Wineries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0641 #10 Y:2025 Adopt in-house material generation $42,983 $240,917
SF0641 #09 Y:2025 Use solar heat to make electricty $205,222 $1,610,673
SF0641 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,736 $39,305
SF0641 #07 Y:2025 Shut off cooling if cold outside air will cool process $4,469 $6,928
SF0641 #06 Y:2025 Insulate bare equipment $4,098 $2,733
SF0641 #05 Y:2025 Eliminate or reduce compressed air usage $1,527 $360
SF0641 #04 Y:2025 Reduce space conditioning during non-working hours $14,638 $2,905
SF0641 #03 Y:2025 Turn off equipment during breaks, reduce operating time $1,400 -
SF0641 #02 Y:2025 Eliminate or reduce compressed air usage $3,689 -
SF0641 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,784 -
SF0635 #07 Y:2025 Insulate bare equipment $290 $1,834
SF0635 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,777 $15,024
SF0635 #05 Y:2025 Recharge batteries on during off-peak demand periods $1,145 $1,677
SF0635 #04 Y:2025 Utilize controls to operate equipment only when needed $3,453 $1,560
SF0635 #03 Y:2025 Turn off equipment when not in use $5,219 $1,820
SF0635 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,209 -
SF0635 #01 Y:2025 Turn off equipment when not in use $175 -
SF0631 #07 Y:2024 Recover waste heat from equipment $4,255 $13,190
SF0631 #06 Y:2024 Use / purchase optimum sized compressor $42,980 $125,625
SF0631 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,321 $6,254