ITAC Assessment: SJ0045
ITAC logo
ITAC Assessment: SJ0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 10,600,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,666,920 19,011,656
kWh
Electricity Demand $1,101,212 46,764
kW-mo/yr
LPG $709,934 38,686
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $417,275 297,728
gal
TOTAL YEARLY COSTS $3,895,341
RECOMMENDED SAVINGS* $618,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,874 $29,414 $2,828
32,156
kWh
$4,046
-
kW-mo/yr
- -
02 2.2621: Modify refrigeration system to operate at a lower pressure $61,426 $144,392 $48,874
555,384
kWh
$12,552
-
kW-mo/yr
- -
03 2.9114: Use solar heat to make electricty $125,925 $1,344,513 $92,280
1,048,630
kWh
$33,645
-
kW-mo/yr
- -
04 4.212: Adopt in-house material generation $357,338 $572,004 $(-20,891.0)
(-237,396)
kWh
$(-39,046.0)
-
kW-mo/yr
- $417,275
-
gal
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,865 $1,023 $946
10,753
kWh
$919
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $37,880 $17,625 - - $37,880
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,986 - $22,457
255,201
kWh
$4,529
-
kW-mo/yr
- -
TOTAL RECOMMENDED $618,294 $2,108,971 $146,494
1,664,728
kWh
$16,645
-
kW-mo/yr
$37,880
-
MMBtu
$417,275
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs