ITAC Assessment: SF0653
ITAC logo
ITAC Assessment: SF0653
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Red and White Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 43,700
ft2
Annual Production 540,000
units
Production Hrs. Annual 2,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,510 531,899
kWh
Electricity Demand $54,752 1,170
kW-mo/yr
LPG $51,901 1,276
MMBtu
TOTAL YEARLY COSTS $231,163
RECOMMENDED SAVINGS* $156,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $8,908 - $6,993
29,873
kWh
$1,915
-
kW-mo/yr
- - - -
02 2.6218: Turn off equipment when not in use $457 - $457
1,951
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,283 $420 $187
799
kWh
$4,096
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $2,383 $358 - - $2,383
-
MMBtu
- - -
05 2.7224: Reduce space conditioning during non-working hours $23,134 $4,215 $1,833
7,826
kWh
- $21,301
-
MMBtu
- - -
06 2.7495: Install replacement doors $19,550 $30,389 $19,550
83,529
kWh
- - - - -
07 2.2622: Replace existing chiller with high efficiency model $76,884 $128,772 $7,602
32,472
kWh
$2,082
-
kW-mo/yr
- - - $67,200
08 2.7142: Utilize higher efficiency lamps and/or ballasts $15,321 $27,270 $6,766
28,900
kWh
$6,320
-
kW-mo/yr
- $2,081 $154 -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,566 $24,058 $5,566
23,776
kWh
- - - - -
TOTAL RECOMMENDED $156,486 $215,482 $48,954
209,126
kWh
$14,413
-
kW-mo/yr
$23,684
-
MMBtu
$2,081 $154 $67,200
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs