ITAC Assessment: UL2604
ITAC logo
ITAC Assessment: UL2604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 65,000
units
Production Hrs. Annual 2,184
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,301 495,799
kWh
Electricity Demand $15,252 1,659
kW-mo/yr
Electricity Fees $21,925 -
Natural Gas $6,746 846
MMBtu
TOTAL YEARLY COSTS $72,224
RECOMMENDED SAVINGS* $30,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $82 - $82
1,440
kWh
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $139 $100 $59
1,038
kWh
- $80
-
MMBtu
-
03 2.2514: Cover open tanks $7,277 $20,661 $7,277
127,437
kWh
- - -
04 2.2692: Use outside cold water source as a supply of cooling water $5,832 $3,000 - - - $5,832
-
Tgal
05 2.9114: Use solar heat to make electricty $17,613 $159,285 $13,813
214,982
kWh
$3,800
-
kW-mo/yr
- -
TOTAL RECOMMENDED $30,943 $183,046 $21,231
344,897
kWh
$3,800
-
kW-mo/yr
$80
-
MMBtu
$5,832
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs