Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Breweries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1029 #09 Y:2021 Turn off steam tracing during mild weather $876 -
UD1029 #08 Y:2021 Analyze flue gas for proper air/fuel ratio $995 -
UD1029 #07 Y:2021 Use minimum steam operating pressure $1,533 -
UD1029 #06 Y:2021 Reduce excessive boiler blowdown $2,088 $4,500
UD1029 #05 Y:2021 Use waste heat from hot flue gases to preheat $3,922 $10,000
UD1029 #04 Y:2021 Use / purchase optimum sized compressor $138 -
UD1029 #03 Y:2021 Eliminate or reduce compressed air usage $541 -
UD1029 #02 Y:2021 Install compressor air intakes in coolest locations $1,027 $4,000
UD1029 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,908 $340
UD0983 #08 Y:2017 Use optimum temperature $355 -
UD0983 #07 Y:2017 Install / repair insulation on steam lines $819 $1,100
UD0983 #06 Y:2017 Use optimum temperature $836 -
UD0983 #05 Y:2017 Analyze flue gas for proper air/fuel ratio $2,115 -
UD0983 #04 Y:2017 Use waste heat from hot flue gases to preheat $4,393 $6,000
UD0983 #03 Y:2017 Chill water to the highest temperature possible $1,019 $4,500
UD0983 #02 Y:2017 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $13,719 $2,500
UD0983 #01 Y:2017 Eliminate or reduce compressed air usage $390 $50
UD0865 #15 Y:2012 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $14,957 $123,000
UD0865 #14 Y:2012 Avoid frost formation on evaporators $7,322 -
UD0865 #13 Y:2012 Utilize a less expensive cooling method $15,846 $24,600