Assessment Year | 2018 |
---|---|
Principal Product | beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
24,000
ft2
|
Annual Production | 40,000
bbl
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $99,404 | 1,097,880 |
kWh
|
$0.091 | |
Natural Gas | $33,080 | 5,027 |
MMBtu
|
$6.58 | |
Waste Disposal Costs | |||||
Water Usage | $21,107 | 7,473 |
Tgal
|
$2.82 | |
Water Disposal | $47,289 | 7,473 |
Tgal
|
$6.33 | |
TOTAL YEARLY COSTS | $200,880 | ||||
RECOMMENDED SAVINGS* | $23,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $3,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $390 | $50 |
$390
4,216
kWh
|
- | |
02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $13,719 | $2,500 |
$13,719
148,200
kWh
|
- | |
03 | 2.2625: Chill water to the highest temperature possible | $1,019 | $4,500 |
$427
4,615
kWh
|
$592
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,393 | $6,000 | - |
$4,393
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,115 | - | - |
$2,115
-
MMBtu
|
|
06 | 2.2211: Use optimum temperature | $836 | - | - |
$836
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $819 | $1,100 | - |
$819
-
MMBtu
|
|
08 | 2.2211: Use optimum temperature | $355 | - | - |
$355
-
MMBtu
|
|
TOTAL RECOMMENDED | $23,646 | $14,150 |
$14,536
157,031
kWh
|
$9,110
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,289 | $1,100 | - |
$3,289
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs