Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Bottled water manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0030 #07 Y:2024 Analyze flue gas for proper air/fuel ratio $5,747 $1,279
NT0030 #06 Y:2024 Clean or color roof to reduce solar load $373 $1,424
NT0030 #05 Y:2024 Apply for investment incentives $82,128 $10,000
NT0030 #04 Y:2024 Reduce space conditioning during non-working hours $510 -
NT0030 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $27,850 -
NT0030 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $23,406 $4,553
NT0030 #01 Y:2024 Optimize plant power factor $60,028 $83,001
CC0040 #08 Y:2024 Use solar heat to make electricty $5,668 $93,870
CC0040 #07 Y:2024 Reduce illumination to minimum necessary levels $8,562 $2,120
CC0040 #06 Y:2024 Eliminate or reduce compressed air usage $6,947 -
CC0040 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $21,675 -
CC0040 #04 Y:2024 Use / purchase optimum sized compressor $138,413 $947,200
CC0040 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $20,745 -
CC0040 #02 Y:2024 Use computer programs to optimize hvac performance $32,890 $17,600
CC0040 #01 Y:2024 Minimize condenser cooling water temperature $14,256 $2,000
TT0318 #08 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,783 $460
TT0318 #07 Y:2024 Replace city water with recycled water via cooling tower $4,912 $15,000
TT0318 #06 Y:2024 Preheat boiler makeup water with waste process heat $5,885 $12,180
TT0318 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $7,815 $1,500
TT0318 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $9,027 $65,640