Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

833

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soft drink manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0642 #12 Y:2025 Install sensors to detect defects $58,822 $28,000
UF0642 #11 Y:2025 Improve space comfort conditioning $66,575 $22,572
UF0642 #10 Y:2025 Level zero – install control systems for existing equipment $75,509 $60,000
UF0642 #09 Y:2025 Eliminate leaks in water lines and valves $2,045 $96
UF0642 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,674 $364
UF0642 #07 Y:2025 Utilize energy-efficient belts and other improved mechanisms $4,894 -
UF0642 #06 Y:2025 Use most efficient type of electric motors $8,671 $20,807
UF0642 #05 Y:2025 Use or replace with energy efficient substitutes $19,952 $69,500
UF0642 #04 Y:2025 Minimize condenser cooling water temperature $23,539 $28,875
UF0642 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $29,425 -
UF0642 #02 Y:2025 Use demand controller or load shedder $70,317 $57,216
UF0642 #01 Y:2025 Use solar heat to make electricty $168,575 $806,620
DL0265 #04 Y:2025 Avoid frost formation on evaporators $53,820 $15,000
DL0265 #03 Y:2025 Use flue gases to heat process or service water $9,055 $35,000
DL0265 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $15,028 $8,000
DL0265 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,608 -
DL0264 #05 Y:2025 Use waste heat from hot flue gases to preheat $82,928 $200,000
DL0264 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $38,350 $12,000
DL0264 #03 Y:2025 Eliminate or reduce compressed air usage $80,790 $125,000
DL0264 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $37,100 $70,000