Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,000

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soft drink and ice manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0570 #08 Y:2025 Use solar heat to make electricty $100,134 $628,503
SU0570 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,969 $16,085
SU0570 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $683 $2,500
SU0570 #05 Y:2025 Use or replace with energy efficient substitutes $764 $2,693
SU0570 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,489 $3,432
SU0570 #03 Y:2025 Improve air circulation with destratification fans / other methods $3,146 $1,150
SU0570 #02 Y:2025 Reduce space conditioning during non-working hours $6,574 $1,490
SU0570 #01 Y:2025 Apply for tax-free status for energy purchases $30,496 -
UF0623 #08 Y:2024 Replace existing equipment with more suitable substitutes $56,000 $20,720
UF0623 #07 Y:2024 Improve combustion control capability $958 $1,400
UF0623 #06 Y:2024 Install turbulators $979 $3,750
UF0623 #05 Y:2024 Turn off equipment when not in use $1,616 -
UF0623 #04 Y:2024 Install de-aerator in place of condensate tank $2,627 $2,343
UF0623 #03 Y:2024 Replace high resistance ducts, pipes, and fittings $4,089 $5,440
UF0623 #02 Y:2024 Preheat combustion air with waste heat $11,057 $4,000
UF0623 #01 Y:2024 Use demand controller or load shedder $21,088 $3,402
GT0986 #05 Y:2024 Use solar heat to make electricty $463,303 $2,451,174
GT0986 #04 Y:2024 Eliminate or reduce compressed air usage $2,990 $2,700
GT0986 #03 Y:2024 Apply for tax-free status for energy purchases $2,353 $800
GT0986 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $15,252 $1,850