ITAC Assessment: MU0096
ITAC logo
ITAC Assessment: MU0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Bottled Water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 1,000,000
ft2
Annual Production 2,888,000,000
units
Production Hrs. Annual 8,688
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,171,869 71,229,600
kWh
Electricity Demand $1,734,325 202,940
kW-mo/yr
Electricity Fees $31,107 -
Natural Gas $106,817 44,964
MMBtu
Other Gas $36,928 1
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $7,081,047
RECOMMENDED SAVINGS* $51,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $16,000 - - - - $16,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,592 - $8,254
113,065
kWh
$1,338
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $9,314 $2,724 $9,314
127,586
kWh
- - -
04 2.7135: Install occupancy sensors $301 $139 $259
3,545
kWh
$42
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $1,411 $875 - - $1,411
-
MMBtu
-
06 2.6125: Keep equipment clean $330 - $284
3,889
kWh
$46
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,180 $5,490 $7,044
96,490
kWh
$1,137
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $4,476 $2,631 $3,852
52,765
kWh
$624
-
kW-mo/yr
- -
09 2.7134: Use photocell controls $483 $125 $417
5,710
kWh
$66
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $746 $2,814 $643
8,804
kWh
$103
-
kW-mo/yr
- -
11 2.4322: Use or replace with energy efficient substitutes $957 $1,150 $825
11,300
kWh
$132
-
kW-mo/yr
- -
TOTAL RECOMMENDED $51,790 $15,948 $30,890
423,154
kWh
$3,488
-
kW-mo/yr
$1,411
-
MMBtu
$16,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs