ITAC Assessment: UF0023
ITAC logo
ITAC Assessment: UF0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CONFECTIONERY PRODUCTS
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area
n/a
Annual Production 450,000
pieces
Production Hrs. Annual 2,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,498 1,527,843
kWh
Natural Gas $6,553 1,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $812 $947 $812
12,016
kWh
02 2.7144: Install spectral reflectors / delamp $5,224 $11,820 $5,224
76,788
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $130 $5,005 $130
2,052
kWh
04 2.4322: Use or replace with energy efficient substitutes $1,460 $4,220 $1,460
21,395
kWh
05 2.4133: Use most efficient type of electric motors $299 $3,700 $299
4,396
kWh
06 2.7492: Use proper thickness of insulation on building envelope $7,776 $30,550 $7,776
114,302
kWh
TOTAL RECOMMENDED $15,701 $56,242 $15,701
230,949
kWh
TOTAL IMPLEMENTED $2,701 $13,872 $2,701
39,859
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs