Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product window coverings
NAICS 337920: Blind and Shade Manufacturing
SIC 2591: Drapery Hardware and Window Blinds and Shades
Sales Range $50
M
to 100
M
# of Employees 244
Plant Area 130,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,190 1,837,082
kWh
Electricity Demand $70,004 5,439
kW-mo/yr
Natural Gas $38,706 3,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $21,600 $15,000 $3,432
52,794
kWh
$2,124
-
kW-mo/yr
- $4,877
-
MMBtu
- $11,167
02 2.7232: Replace existing hvac unit with high efficiency model $18,118 $1,600 - - - $18,118
-
MMBtu
- -
03 2.7261: Install timers and/or thermostats $5,402 $2,000 - - - $5,402
-
MMBtu
- -
04 2.4322: Use or replace with energy efficient substitutes $4,065 $11,000 $1,141
17,563
kWh
$378
-
kW-mo/yr
- - $2,546 -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,500 $2,500 - $3,500
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,990 $400 $2,167
33,333
kWh
$823
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $1,531 $300 $1,531
23,542
kWh
- - - - -
08 2.7111: Reduce illumination to minimum necessary levels $613 $20 $376
5,791
kWh
$216
-
kW-mo/yr
$21 - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $15,674 $25,073 $9,975
153,483
kWh
$5,699
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $73,493 $57,893 $18,622
286,506
kWh
$12,740
-
kW-mo/yr
$21 $28,397
-
MMBtu
$2,546 $11,167
TOTAL IMPLEMENTED $26,842 $38,993 $13,659
210,170
kWh
$10,616
-
kW-mo/yr
$21 - $2,546 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings