Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,259

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Beverage manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0745 #03 Y:2021 Eliminate or reduce compressed air usage $1,286 $485
OR0745 #02 Y:2021 Install compressor air intakes in coolest locations $1,360 $542
OR0745 #01 Y:2021 Remove or close off unneeded compressed air lines $11,633 $395
SD0615 #03 Y:2021 Utilize higher efficiency lamps and/or ballasts $385 $1,182
SD0615 #02 Y:2021 Eliminate or reduce compressed air usage $540 -
SD0615 #01 Y:2021 Clean or color roof to reduce solar load $4,310 $6,942
LS2116 #05 Y:2021 Use solar heat to make electricty $35,399 $646,020
LS2116 #04 Y:2021 Clean or color roof to reduce solar load $19,226 $35,236
LS2116 #03 Y:2021 Use waste heat from hot flue gases to preheat $6,943 $4,200
LS2116 #02 Y:2021 Install occupancy sensors $4,408 $250
LS2116 #01 Y:2021 Make a practice of turning off lights when not needed $9,222 $300
UK2106 #11 Y:2021 Replace fossil fuel equipment with electrical equipment $10,154 $600
UK2106 #10 Y:2021 Insulate bare equipment $1,250 $881
UK2106 #09 Y:2021 Preheat combustion air with waste heat $49,643 $75,000
UK2106 #08 Y:2021 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $731,255 $3,500,000
UK2106 #07 Y:2021 Install occupancy sensors $1,142 $640
UK2106 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $267 $100
UK2106 #05 Y:2021 Lower temperature during the winter season and vice-versa $330 $80
UK2106 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $7,035 $2,510
UK2106 #03 Y:2021 Install compressor air intakes in coolest locations $685 $1,660