ITAC Assessment: LS2116
ITAC logo
ITAC Assessment: LS2116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range less than $500
k
# of Employees 37
Plant Area 85,000
ft2
Annual Production 16,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,932 1,934,400
kWh
Electricity Demand $39,252 4,493
kW-mo/yr
Natural Gas $35,106 5,440
MMBtu
TOTAL YEARLY COSTS $226,290
RECOMMENDED SAVINGS* $75,198 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $9,222 $300 $9,222
116,732
kWh
-
02 2.7135: Install occupancy sensors $4,408 $250 $4,408
55,793
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $6,943 $4,200 - $6,943
-
MMBtu
04 2.7425: Clean or color roof to reduce solar load $19,226 $35,236 $19,226
243,361
kWh
-
05 2.9114: Use solar heat to make electricty $35,399 $646,020 $35,399
448,084
kWh
-
TOTAL RECOMMENDED $75,198 $686,006 $68,255
863,970
kWh
$6,943
-
MMBtu
TOTAL IMPLEMENTED $13,630 $550 $13,630
172,525
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs