ITAC Assessment: SD0615
ITAC logo
ITAC Assessment: SD0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 13,850
ft2
Annual Production 85
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,189 75,628
kWh
Electricity Demand $965 225
kW-mo/yr
Electricity Fees $3,608 -
TOTAL YEARLY COSTS $19,762
RECOMMENDED SAVINGS* $5,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,235

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $4,310 $6,942 $4,095
20,392
kWh
$215
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $540 - $540
2,688
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $385 $1,182 $325
1,616
kWh
$60
-
kW-mo/yr
TOTAL RECOMMENDED $5,235 $8,124 $4,960
24,696
kWh
$275
-
kW-mo/yr
TOTAL IMPLEMENTED $5,235 $8,124 $4,960
24,696
kWh
$275
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs