2,259
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SJ0057 #11 Y:2026 | 11 | 2026 | Minimize water usage | $2,103 | $11,327 |
n/a
|
| SJ0057 #10 Y:2026 | 10 | 2026 | Adopt in-house material generation | $440,085 | $81,519 |
n/a
|
| SJ0057 #09 Y:2026 | 09 | 2026 | Modify refrigeration system to operate at a lower pressure | $40,591 | $67,196 |
n/a
|
| SJ0057 #08 Y:2026 | 08 | 2026 | Install / repair insulation on steam lines | $3,606 | $733 |
n/a
|
| SJ0057 #07 Y:2026 | 07 | 2026 | Install vinyl strip / high speed / air curtain doors | $26,938 | $7,246 |
n/a
|
| SJ0057 #06 Y:2026 | 06 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $1,841 | $3,566 |
n/a
|
| SJ0057 #05 Y:2026 | 05 | 2026 | Utilize controls to operate equipment only when needed | $512 | $929 |
n/a
|
| SJ0057 #04 Y:2026 | 04 | 2026 | Recover waste heat from equipment | $4,351 | $4,420 |
n/a
|
| SJ0057 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,628 | - |
n/a
|
| SJ0057 #02 Y:2026 | 02 | 2026 | Install compressor air intakes in coolest locations | $492 | $1,850 |
n/a
|
| SJ0057 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $767 | - |
n/a
|
| UF0651 #08 Y:2026 | 08 | 2026 | Re-arrange equipment layout to reduce labor costs | $605 | $1,760 |
n/a
|
| UF0651 #07 Y:2026 | 07 | 2026 | Improve space comfort conditioning | $14,650 | $6,200 |
n/a
|
| UF0651 #06 Y:2026 | 06 | 2026 | Automate finishing process | $67,638 | $48,000 |
n/a
|
| UF0651 #05 Y:2026 | 05 | 2026 | Meter waste water | $4,190 | $4,384 |
n/a
|
| UF0651 #04 Y:2026 | 04 | 2026 | Clean or color roof to reduce solar load | $2,970 | $7,320 |
n/a
|
| UF0651 #03 Y:2026 | 03 | 2026 | Use solar heat to heat water | $13,638 | $31,360 |
n/a
|
| UF0651 #02 Y:2026 | 02 | 2026 | Use solar heat to make electricty | $16,306 | $80,227 |
n/a
|
| UF0651 #01 Y:2026 | 01 | 2026 | Use or replace with energy efficient substitutes | $75,000 | $5,000 |
n/a
|
| MU0096 #11 Y:2026 | 11 | 2026 | Use or replace with energy efficient substitutes | $957 | $1,150 |
n/a
|