Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,259

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Beverage manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0057 #11 Y:2026 Minimize water usage $2,103 $11,327
SJ0057 #10 Y:2026 Adopt in-house material generation $440,085 $81,519
SJ0057 #09 Y:2026 Modify refrigeration system to operate at a lower pressure $40,591 $67,196
SJ0057 #08 Y:2026 Install / repair insulation on steam lines $3,606 $733
SJ0057 #07 Y:2026 Install vinyl strip / high speed / air curtain doors $26,938 $7,246
SJ0057 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,841 $3,566
SJ0057 #05 Y:2026 Utilize controls to operate equipment only when needed $512 $929
SJ0057 #04 Y:2026 Recover waste heat from equipment $4,351 $4,420
SJ0057 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,628 -
SJ0057 #02 Y:2026 Install compressor air intakes in coolest locations $492 $1,850
SJ0057 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $767 -
UF0651 #08 Y:2026 Re-arrange equipment layout to reduce labor costs $605 $1,760
UF0651 #07 Y:2026 Improve space comfort conditioning $14,650 $6,200
UF0651 #06 Y:2026 Automate finishing process $67,638 $48,000
UF0651 #05 Y:2026 Meter waste water $4,190 $4,384
UF0651 #04 Y:2026 Clean or color roof to reduce solar load $2,970 $7,320
UF0651 #03 Y:2026 Use solar heat to heat water $13,638 $31,360
UF0651 #02 Y:2026 Use solar heat to make electricty $16,306 $80,227
UF0651 #01 Y:2026 Use or replace with energy efficient substitutes $75,000 $5,000
MU0096 #11 Y:2026 Use or replace with energy efficient substitutes $957 $1,150