37
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0166 #12 Y:2022 | 12 | 2022 | Install compressor air intakes in coolest locations | $136 | $665 | |
| IP0166 #11 Y:2022 | 11 | 2022 | Optimize plant power factor | $11,046 | $43,200 | |
| IP0166 #10 Y:2022 | 10 | 2022 | Install compressor air intakes in coolest locations | $279 | $665 | |
| IP0166 #09 Y:2022 | 09 | 2022 | Utilize higher efficiency lamps and/or ballasts | $198 | $416 | |
| IP0166 #08 Y:2022 | 08 | 2022 | Recover waste heat from equipment | $704 | $1,279 | |
| IP0166 #07 Y:2022 | 07 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,433 | $1,162 | |
| IP0166 #06 Y:2022 | 06 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $6,625 | $3,274 | |
| IP0166 #05 Y:2022 | 05 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $526 | $33 | |
| IP0166 #04 Y:2022 | 04 | 2022 | Reduce space conditioning during non-working hours | $2,623 | - | |
| IP0166 #03 Y:2022 | 03 | 2022 | Chill water to the highest temperature possible | $9,132 | - | |
| IP0166 #02 Y:2022 | 02 | 2022 | Chill water to the highest temperature possible | $4,102 | - | |
| IP0166 #01 Y:2022 | 01 | 2022 | Chill water to the highest temperature possible | $12,766 | - | |
| IC0231 #05 Y:2019 | 05 | 2019 | Recharge batteries on during off-peak demand periods | $5,416 | - | |
| IC0231 #04 Y:2019 | 04 | 2019 | Install compressor air intakes in coolest locations | $12,061 | $2,400 | |
| IC0231 #03 Y:2019 | 03 | 2019 | Use / purchase optimum sized compressor | $5,211 | $50,440 | |
| IC0231 #02 Y:2019 | 02 | 2019 | Utilize higher efficiency lamps and/or ballasts | $21,285 | $6,673 | |
| IC0231 #01 Y:2019 | 01 | 2019 | Optimize plant power factor | $15,040 | $26,145 | |
| IC0212 #03 Y:2019 | 03 | 2019 | Use waste heat from hot flue gases to preheat | $5,487 | $10,350 | |
| IC0212 #02 Y:2019 | 02 | 2019 | Use most efficient type of electric motors | $19,906 | $53,007 | |
| IC0212 #01 Y:2019 | 01 | 2019 | Base utility charges on usage rather than area occupied | $59,063 | $2,920 |