Assessment Year | 2023 |
---|---|
Principal Product | Winemaking |
NAICS | 312130: Wineries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
106,000
ft2
|
Annual Production | 1,800
Tgal
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $96,017 | 1,735,577 |
kWh
|
$0.055 | |
Electricity Demand | $83,159 | 5,777 |
kW-mo/yr
|
$14.39 | |
Electricity Fees | $13,724 | - |
|
- | |
LPG | $161,874 | 7,723 |
MMBtu
|
$20.96 | |
Waste Disposal Costs | |||||
Water Usage | $23,890 | 3,153 |
Tgal
|
$7.58 | |
TOTAL YEARLY COSTS | $378,664 | ||||
RECOMMENDED SAVINGS* | $49,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $22,866 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2625: Chill water to the highest temperature possible | $12,766 | - |
$5,793
96,554
kWh
|
$6,973
-
kW-mo/yr
|
- | - | |
02 | 2.2625: Chill water to the highest temperature possible | $4,102 | - |
$1,609
32,178
kWh
|
$2,493
-
kW-mo/yr
|
- | - | |
03 | 2.2625: Chill water to the highest temperature possible | $9,132 | - |
$3,615
72,301
kWh
|
$5,517
-
kW-mo/yr
|
- | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $2,623 | - |
$863
7,847
kWh
|
- | - |
$1,760
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $526 | $33 |
$526
10,512
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,625 | $3,274 |
$6,625
110,417
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,433 | $1,162 |
$1,433
28,660
kWh
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $704 | $1,279 | - | - | - |
$704
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $198 | $416 |
$198
1,789
kWh
|
- | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $279 | $665 |
$134
2,689
kWh
|
$145
-
kW-mo/yr
|
- | - | |
11 | 2.3212: Optimize plant power factor | $11,046 | $43,200 | - | - | $11,046 | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $136 | $665 |
$65
1,302
kWh
|
$71
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $49,570 | $50,694 |
$20,861
364,249
kWh
|
$15,199
-
kW-mo/yr
|
$11,046 |
$2,464
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,866 | $49,415 |
$9,844
163,216
kWh
|
$216
-
kW-mo/yr
|
$11,046 |
$1,760
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs