ITAC Assessment: IC0212
ITAC logo
ITAC Assessment: IC0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Drink Products
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 280,000
ft2
Annual Production 1,130,000
Tgal
Production Hrs. Annual 6,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,159,621 11,316,384
kWh
Natural Gas $162,345 41,030
MMBtu
Waste Disposal Costs
Water Usage $373,069 174,320
Tgal
Water Disposal $587,809 83,960
Tgal
TOTAL YEARLY COSTS $2,282,844
RECOMMENDED SAVINGS* $84,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.8115: Base utility charges on usage rather than area occupied $59,063 $2,920 - $59,063 -
02 2.4133: Use most efficient type of electric motors $19,906 $53,007 $19,906
199,065
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $5,487 $10,350 - - $5,487
-
MMBtu
TOTAL RECOMMENDED $84,456 $66,277 $19,906
199,065
kWh
$59,063 $5,487
-
MMBtu
TOTAL IMPLEMENTED $59,063 $2,920 - $59,063 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs