Assessment Year | 1998 |
---|---|
Principal Product | Marine Propulsion Systems |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $100 M to 500M |
# of Employees | 1,100 |
Plant Area |
300,000
ft2
|
Annual Production | 93,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,150,540 | 41,006,155 |
kWh
|
$0.028 |
Electricity Demand | $728,426 | - |
|
- |
Natural Gas | $528,547 | 168,108 |
MMBtu
|
$3.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,627,161 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,828 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $69,793 | $76,000 |
$69,793
2,865,182
kWh
|
- | - | - | - | |
02 | 2.2442: Preheat combustion air with waste heat | $19,308 | $57,400 | - |
$19,308
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,035 | $6,760 |
$14,035
579,426
kWh
|
- | - | - | - | |
04 | 2.2514: Cover open tanks | $12,366 | $7,500 | - |
$12,366
-
MMBtu
|
- | - | - | |
05 | 4.211: Consider use / purchase of bulk materials where possible | $1,200,000 | - | - | - | - | - | $1,200,000 | |
06 | 4.321: Optimize production lot sizes and inventories | $200,000 | - | - | - | - | $200,000 | - | |
07 | 4.211: Consider use / purchase of bulk materials where possible | $36,659 | $100,000 | - | - | - | - | $36,659 | |
08 | 3.5316: Contract a wood pallet recycling company | $75,000 | - | - | - |
$75,000
-
lb
|
- | - | |
TOTAL RECOMMENDED | $1,627,161 | $247,660 |
$83,828
3,444,608
kWh
|
$31,674
-
MMBtu
|
$75,000
-
lb
|
$200,000 | $1,236,659 | ||
TOTAL IMPLEMENTED | $83,828 | $82,760 |
$83,828
3,444,608
kWh
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs