ITAC Assessment: OK0553
ITAC logo
ITAC Assessment: OK0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Marine Propulsion Systems
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $100
M
to 500
M
# of Employees 1,100
Plant Area 300,000
ft2
Annual Production 93,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,150,540 41,006,155
kWh
Electricity Demand $728,426 -
Natural Gas $528,547 168,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,627,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $69,793 $76,000 $69,793
2,865,182
kWh
- - - -
02 2.2442: Preheat combustion air with waste heat $19,308 $57,400 - $19,308
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,035 $6,760 $14,035
579,426
kWh
- - - -
04 2.2514: Cover open tanks $12,366 $7,500 - $12,366
-
MMBtu
- - -
05 4.211: Consider use / purchase of bulk materials where possible $1,200,000 - - - - - $1,200,000
06 4.321: Optimize production lot sizes and inventories $200,000 - - - - $200,000 -
07 4.211: Consider use / purchase of bulk materials where possible $36,659 $100,000 - - - - $36,659
08 3.5316: Contract a wood pallet recycling company $75,000 - - - $75,000
-
lb
- -
TOTAL RECOMMENDED $1,627,161 $247,660 $83,828
3,444,608
kWh
$31,674
-
MMBtu
$75,000
-
lb
$200,000 $1,236,659
TOTAL IMPLEMENTED $83,828 $82,760 $83,828
3,444,608
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs