Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Flavors & Fragrances
NAICS 311942: Spice and Extract Manufacturing
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 233
Plant Area 185,000
ft2
Annual Production 4,698
ton
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $782,046 6,214,416
kWh
Electricity Demand $102,133 14,362
kW-mo/yr
Electricity Fees $194,360 -
Natural Gas $159,408 29,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,237

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $10,165 $40 $9,433
74,862
kWh
$732
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,455 $1,000 $35,689
283,246
kWh
$2,766
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,210 $3,040 - $10,210
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $8,746 $11,000 $5,788
45,939
kWh
$2,958
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $7,685 $12,000 $6,806
54,013
kWh
$706
-
kW-mo/yr
- $173
06 2.2441: Preheat boiler makeup water with waste process heat $8,266 $13,200 - - $8,266
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,022 $1,700 $868
6,889
kWh
$117
-
kW-mo/yr
- $37
08 2.1233: Analyze flue gas for proper air/fuel ratio $2,231 $4,000 - - $2,231
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,496 $12,000 $3,027
24,024
kWh
$469
-
kW-mo/yr
- $2,000
10 2.7135: Install occupancy sensors $10,832 $25,185 $9,795
77,742
kWh
$25
-
kW-mo/yr
- $1,012
11 2.7232: Replace existing hvac unit with high efficiency model $4,728 $11,400 $3,790
30,076
kWh
$939
-
kW-mo/yr
- -
TOTAL RECOMMENDED $107,837 $94,565 $75,196
596,791
kWh
$18,922
-
kW-mo/yr
$10,497
-
MMBtu
$3,222
TOTAL IMPLEMENTED $72,237 $62,885 $61,974
491,853
kWh
$7,041
-
kW-mo/yr
- $3,222
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs